• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    LMS粉塵氣溶膠發生器原版使用手冊

    Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread la
    下載次數:346 瀏覽次數:603發布時間:2018-07-01 17:16
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    - Unpack the dust feeder.

    - Plug in the electrical line to standard 220-240 VAC outlet.

    - Note that the feeder tray slides freely on two nylon rails when the vertical lever pin is disengaged (lifted up) from the feeding chain.

    - Set the tray in position by inserting (push down) vertical lever pin between two links on the feeding chain at approx. 3 inch or more forward of the sprocket that turns the chain.

    - Since the dust will be spread evenly across the width of the tray, and the tray advances ~28 cm (~11”) in 10 minutes, it is necessary to mark on the tray where the dust will be placed; make a mark on one edge of the tray that rides on a nylon bar near the paddle wheel – designate this as the starting point (0) for dust placement. Turn on the tray feed toggle, allow 10 minutes for the tray to advance, then mark the tray again – about 28 cm back from the staring point - designate this as the stopping point (10) for dust placement.

    - Supply an air pressure line (720 Kpa max) to the air inlet fitting (1/4 FPT) located on the side of the unit.   Option: it may be desirable to connect a standard shut-off valve and/or a quick-disconnect fitting(s) at this air inlet for convenience.  

    - Dry-run the unit without dust on tray to check unit operation:  with electricity & 700 Kpa at air inlet, turn on toggle switches first for TRAY FEED, then PADDLE WHEEL, then ASPIRATOR, and ascertain that tray moves slowly, paddle wheel rotates with wheel guard down, and that forced air comes out of the delivery tube.  

    OPERATION

    - Set the line pressure to 600 Kpa (for ASHRAE usage the airflow is 14.5 scfm and pressure should be set accordingly to achieve this flow rate). Refer to section 5.4 in the ASHRAE 52.1 procedures.

    - Connect the air outlet of the delivery tube to your test air duct. 

    - Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread layer between the two start/stop marks (0 and 10 min.) on the tray.  Depending on the flow rate of the filter under test, the amount of dust needed equates to 2 grams of dust per 1000 cfm of air flow in the duct per minute of dust feed.

    ?

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    国产中文字幕在线| 人妻系列AV无码专区| 一本大道东京热无码一区| 无码人妻精品一区二区蜜桃百度| 免费无码又爽又刺激网站直播| 伊人久久无码精品中文字幕| 亚洲av无码成人黄网站在线观看| 无码人妻黑人中文字幕| 国精品无码A区一区二区| 亚洲av永久无码精品国产精品 | 色综合久久久久无码专区| 无码人妻黑人中文字幕| 亚洲Av无码乱码在线观看性色| 人妻无码视频一区二区三区| 中文字幕人妻无码一夲道| 亚洲JIZZJIZZ中国少妇中文| 欧美精品中文字幕亚洲专区| 精品无码久久久久久久动漫| 久久午夜伦鲁片免费无码| 亚洲av日韩av高潮潮喷无码| 国产AV无码专区亚洲AWWW| 无码夫の前で人妻を侵犯| 一二三四在线播放免费观看中文版视频| 无码精品A∨在线观看中文| 亚洲av无码一区二区三区人妖| 精品无码国产自产拍在线观看蜜| 国产午夜精品无码| 国产AV无码专区亚洲AV男同| 免费无码又爽又刺激高潮视频 | 亚洲人成影院在线无码按摩店| 少妇中文无码高清| 日韩久久久久中文字幕人妻| 亚洲国产中文v高清在线观看| 最近最新高清免费中文字幕 | 亚洲一日韩欧美中文字幕欧美日韩在线精品一区二| 色噜噜亚洲精品中文字幕| 伊人久久一区二区三区无码| 中文字幕乱码人妻一区二区三区| 制服丝袜人妻中文字幕在线| 日本久久久精品中文字幕| 中文字幕一区二区三区日韩精品|