• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來(lái)Nano電子商城!
    您好 [請(qǐng)登錄](méi)   [免費(fèi)注冊(cè)]
    x
    全部商品分類(lèi)

    Bonderite_L_GP_333_Black_PTFE_Coating產(chǎn)品資料

    下載次數(shù):153 瀏覽次數(shù):470發(fā)布時(shí)間:2017-11-11 20:29
    允許查看的會(huì)員等級(jí):非會(huì)員   普通會(huì)員   高級(jí)會(huì)員   VIP會(huì)員   

    文檔詳情

    Surface Preparation

    Substrates must be dry and free of contaminants (dirt, grease, powder, and other

    residues)before application of Emralon 333. Excellent results can be obtained without pretreatment.However,

    for maximum wear characteristics the following pre-treatment’s are

    recommended:heat stable phosphate coating* or grit blasting for steel; grit blasting or heat

    stable conversioncoating for aluminum.

    Mixing

    Emralon 333 is supplied ready for use, but it should be mixed thoroughly by stirring. For

    bestresults, use a low speed propeller-type mixer. Do not vortex or agitate violently, as

    airentrapment or foaming may cause separation of solids.

    Application

    Emralon 333 is normally applied by spray techniques. An external atomizing type gun

    usingan MBC #30 nozzle is recommended. Optimum coating thickness is 0.001 inch

    (25.4microns). USE ONLY SB-3 SOLVENT FOR CLEAN-UP. Incompatible solvents will

    cause gunblockage. Emralon 333can be overcoated for repair purposes without removing

    the entireoriginal film. Sand lightly or use steel wool to feather the edges of the area to be

    repaired.Light abrasion of the surrounding areas is also recommended for maximum

    adhesion. Thenapply Emralon 333, using the same spray procedures as for the initial

    application. Follow thestandard cure cycle as stated below.

    Curing

    Emralon 333 may be cured by exposure to any of the time/temperature conditions

    indicated inthe following table. It is essential that the high boiling solvents in Emralon

    333be removedgradually before the cure is completed or the coating will be marred by

    blisters. Gradualremoval of the solvent can be accomplished by preheating the coating for

    ten minutes at149°C (300°F) or 177°C (350°F) before curing.

    For example, typical cure cycles are:

    SUBSTRATE TEMP/TIME SUBSTRATE TEMP/TIME

    (a) 149°C (300°F) 10 min.

    (b) 149°C (300°F) 10 min.

    (c) 149°C (300°F) 10 min.

    (d) 177°C (350°F) 10 min.

    (e) 177°C (350°F) 10 min.

    260°C (500°F)/ 15 min.

    288°C (550°F)/ 9 min.

    316°C (600°F)/ 5 min.

    371°C (700°F)/ 1 min.

    399°C (750°F)/ ? min. 

    我們營(yíng)業(yè)的時(shí)間9:00-18:00

    • 技術(shù)
    關(guān)閉在線(xiàn)客服

    Nano電子商城微信公眾號(hào)手機(jī)商城 Nano電子商城微信公眾號(hào)二維碼

    手機(jī)商城           微信商城

    任何購(gòu)物問(wèn)題請(qǐng)聯(lián)系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開(kāi)發(fā)區(qū)章基路189號(hào)科創(chuàng)基地2號(hào)樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時(shí)間:周一至周五 8:00-18:00; 網(wǎng)站備案號(hào) :滬ICP備12049383號(hào); Copyright?2009-2012 19mro.com 版權(quán)所有 


     
    亚洲AⅤ无码一区二区三区在线| 国产成人无码一区二区在线观看 | 亚洲无码黄色网址| 夜夜添无码试看一区二区三区| 国产 亚洲 中文在线 字幕| 无码成A毛片免费| 在线亚洲欧美中文精品| 一本一道av中文字幕无码| 国产∨亚洲V天堂无码久久久| 国产aⅴ激情无码久久| 爆操夜夜操天天操中文| 人妻丰满熟妇A v无码区不卡| 免费精品无码AV片在线观看| 中文字幕日韩三级片| 亚洲国产综合精品中文第一区| 国产成人亚洲综合无码| 无码人妻丰满熟妇区免费| 中文字幕手机在线观看| 久久亚洲中文字幕精品一区| √天堂中文官网8在线| 亚洲?V无码乱码国产精品| 国产亚洲精品无码拍拍拍色欲| 日韩精品人妻系列无码专区免费 | 亚洲一日韩欧美中文字幕欧美日韩在线精品一区二 | 亚洲国产精品无码久久| 亚洲天堂中文字幕在线| 久久久这里有精品中文字幕| 最近中文字幕国语免费完整 | 久久亚洲精品成人无码网站| 欧美中文字幕无线码视频| 久久国产高清字幕中文| 精品久久久久中文字幕日本| 亚洲中文精品久久久久久不卡| 中文字幕亚洲乱码熟女一区二区| 一级电影在线播放无码| 天堂亚洲国产中文在线| 亚洲va中文字幕无码久久| 久久综合中文字幕| 乱人伦人妻中文字幕无码| 国产成人综合日韩精品无码不卡 | 免费A级毛片无码A∨|