• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    Milbond原版使用手冊

    下載次數:564 瀏覽次數:266發布時間:2017-05-24 09:51
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    OPTICAL SURFACE

    All contaminants, chemicals, pencil marks, etc., should be removed from the glass surface.

    Stubborn material can be removed by scouring with a paste of pumice or calcium carbonate and

    water. The residue should be removed with deionized or distilled water. The glass surface

    should then be thoroughly cleaned with acetone, using moistened (not wet), clean cheesecloth

    or lens tissue. Cotton tipped applicators should not be used. The glass surface must be dry

    before either primer or bonding material is applied.

    METAL SURFACE

    Except in special cases, the metal bonding surface must be free from corrosion products, burrs,

    surface impregnants, anodic, passivation, oxide and other surface treatments as well as other

    surface contaminants. Imperfections should be removed by careful rubbing with a medium or

    fine abrasive paper or cloth, while being careful not to destroy the physical dimensions and

    flatness of the surface. The surface should then be wiped with cheesecloth or lens tissue

    moistened with acetone. Cotton tipped applicators should not be used. The surface should be

    allowed to dry completely before the primer or bonding material is applied.

    PREPARATION OF PRIMER

    The base resin and curing agent should be vigorously stirred or better yet agitated for one hour

    to disperse any solids. One part BY VOLUME of the curing agent should be added to an equal

    volume of the base, and the two components thoroughly mixed. The mixture should be

    allowed to stand for one half hour before it is used. During this time it should be capped.

    Any unused primer should be discarded no longer than eight hours after mixing (four hours for

    best results).

    APPLICATION OF PRIMER

    The primer should be applied as described below to an area which is at least as large as the

    cured bond area shown on the engineering drawing. The primer should be applied within two

    hours after cleaning and the primed surface should be bonded within 30 days after application.

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    久久久久亚洲AV片无码下载蜜桃| 久久激情亚洲精品无码?V| 国产精品午夜福利在线无码| 无码成人精品区在线观看| 亚洲成a人在线看天堂无码 | 亚洲av成人无码久久精品| 亚洲中久无码不卡永久在线观看| 亚洲热妇无码AV在线播放| 久久久中文字幕日本| 中文字幕专区高清在线观看| 国产精品无码久久久久久| 亚洲真人无码永久在线| 中文无码精品一区二区三区| 中文字幕亚洲男人的天堂网络| 狠狠躁天天躁无码中文字幕| 国产成人亚洲综合无码| 亚洲日韩在线中文字幕第一页| 色噜噜综合亚洲av中文无码| 免费无码国产在线观国内自拍中文字幕| 亚洲一区精品无码| 成人麻豆日韩在无码视频| 最近中文字幕高清中文字幕无 | а天堂8中文最新版在线官网| 国产麻豆天美果冻无码视频| 日日摸日日踫夜夜爽无码| 亚洲AV无码乱码国产麻豆穿越 | 中文字幕无码日韩专区免费| 日本一区二区三区中文字幕 | 中文字幕精品无码一区二区| 亚洲中文精品久久久久久不卡| 亚洲?V无码乱码国产精品| 亚洲午夜福利精品无码| 一本色道无码道在线| 影院无码人妻精品一区二区| 熟妇人妻中文字幕| 中文无码久久精品| 国产精品中文字幕在线观看| 在线中文字幕av| 精品无码国产自产在线观看水浒传 | 亚洲午夜福利AV一区二区无码| 国产丝袜无码一区二区三区视频|