• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    Milbond原版使用手冊

    下載次數:558 瀏覽次數:259發布時間:2017-05-24 09:51
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    OPTICAL SURFACE

    All contaminants, chemicals, pencil marks, etc., should be removed from the glass surface.

    Stubborn material can be removed by scouring with a paste of pumice or calcium carbonate and

    water. The residue should be removed with deionized or distilled water. The glass surface

    should then be thoroughly cleaned with acetone, using moistened (not wet), clean cheesecloth

    or lens tissue. Cotton tipped applicators should not be used. The glass surface must be dry

    before either primer or bonding material is applied.

    METAL SURFACE

    Except in special cases, the metal bonding surface must be free from corrosion products, burrs,

    surface impregnants, anodic, passivation, oxide and other surface treatments as well as other

    surface contaminants. Imperfections should be removed by careful rubbing with a medium or

    fine abrasive paper or cloth, while being careful not to destroy the physical dimensions and

    flatness of the surface. The surface should then be wiped with cheesecloth or lens tissue

    moistened with acetone. Cotton tipped applicators should not be used. The surface should be

    allowed to dry completely before the primer or bonding material is applied.

    PREPARATION OF PRIMER

    The base resin and curing agent should be vigorously stirred or better yet agitated for one hour

    to disperse any solids. One part BY VOLUME of the curing agent should be added to an equal

    volume of the base, and the two components thoroughly mixed. The mixture should be

    allowed to stand for one half hour before it is used. During this time it should be capped.

    Any unused primer should be discarded no longer than eight hours after mixing (four hours for

    best results).

    APPLICATION OF PRIMER

    The primer should be applied as described below to an area which is at least as large as the

    cured bond area shown on the engineering drawing. The primer should be applied within two

    hours after cleaning and the primed surface should be bonded within 30 days after application.

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    国产成人无码区免费内射一片色欲| 精品无码一区在线观看| 成人免费无码H在线观看不卡 | 亚洲AV永久无码精品水牛影视| 中文字幕无码一区二区免费 | 色窝窝无码一区二区三区色欲| 最近最好最新2019中文字幕免费| 精品一区二区无码AV| 亚洲色无码专区在线观看| 国产精品中文字幕在线观看| 日韩少妇无码喷潮系列一二三| 黄A无码片内射无码视频| 久久无码国产专区精品| 中文字幕成人免费视频| 中文字幕热久久久久久久 | 亚洲av麻豆aⅴ无码电影| 日韩精品无码AV成人观看| 国产成人无码区免费内射一片色欲| 日本三级在线中文字幕在线|中文| 午夜精品久久久久久久无码| 国产在线无码视频一区二区三区| 亚洲av无码无在线观看红杏| 中文字幕一区二区免费| 日本高清免费中文在线看| 日韩中文字幕在线视频| 久久精品天天中文字幕人妻| 中文字幕人成高清视频| 无码专区国产无套粉嫩白浆内射| 国产亚洲精品无码拍拍拍色欲| AV无码久久久久不卡蜜桃| YW尤物AV无码国产在线观看| 成在人线av无码免费高潮水| 韩国免费a级作爱片无码| 国产午夜无码视频在线观看| av一区二区人妻无码| 无码人妻精品一区二区蜜桃百度| 国产精品无码v在线观看| 亚洲高清无码在线观看| 久久中文字幕人妻丝袜| 天堂а√在线中文在线| 色综合久久中文字幕综合网|